WET Engineering
4337 Pablo Oaks Court, #101
Jacksonville, Florida 32224
(904) 223-9773

logo

brochure2

Download Our Brochure

“WET Engineering is not only efficient & effective in their professional role, but they take the time to engage with clients with a genuine interest in how a project impacts the entire area and community. Their knowledge & attention to detail have aided the Cross City in securing funding and completing time sensitive projects.”
Gary Pinner
City Manager
Town of Cross City

WET Engineering can assist with any aspect of the aquatics design process:

Master Planning and Conceptual Design

We can coordinate feasibility studies for the proposed aquatics facility and provide an opinion of probable cost to aid in the decision making process from the start. A conceptual plan can be developed based on this data and can be used as needed by the owner to secure financing, for fundraising, or community involvement and comment, whatever the case may be. We can also evaluate existing facilities for feasibility of expansion and/or retrofit and determine the associated projected costs.

Design and Permitting

WET Engineering is able to deliver complete design assistance from concept all the way to biddable construction documents. Not only does our team possess exhaustive aquatics expertise, but we are also a full-service civil engineering firm which means we can provide site paving and drainage, stormwater collection, and utility design engineering services as needed. We work with a seasoned team of design professionals including electrical, structural, and HVAC engineers, food service designers, architects and landscape architects when necessitated by the project to ensure a turn-key product to the client. Having worked on projects across the country, we are familiar with permitting through hundreds of state and local health departments and local building departments. We’ve seen it all and know what it takes to help the permitting process to proceed as smoothly as possible.

Construction Administration

Our commitment to the project doesn’t stop at the end of the design phase. Depending on the project and the client’s needs, we can offer production of complete bid documents including formal specifications, bid forms, and announcements. We can also help with attendance at pre-bid meetings, distribution of bid documents, and bid evaluation. Once construction is underway, we can be there for periodic progress meetings and construction observation and can take care of requests for additional information, submittal/shop drawing review, pay request review, and final certification site visits.

Code Compliance

Owning and operating aquatics facilities becomes more complex every day with respect to government regulation. We were at the forefront with assisting our clients with implementation of the Virginia Graeme Baker Pool and Spa Safety Act (VGB) that went into effect in December 2008. You can be assured that all of our aquatics designs comply with VGB as cost-effectively as possible. And as the Americans with Disabilities Act and Architectural Barriers Act Guidelines (ADAAG) become enforceable in March 2012 we will be there again to provide help with determining where and if retrofits are required in our clients’ facilities. We have been incorporating the ADAAG with our designs for years, so most of our past projects will comply. Let us assist with evaluation of your facility regarding the ADAAG or VGB requirements or with state and local codes and what it takes to achieve compliance.

Click here to view our Aquatic Projects.

WET Engineering
4337 Pablo Oaks Court, Suite 101
Jacksonville, Florida 32224
Phone: (904) 223-9773
Copyright © 2017 - All Rights Reserved
Design By Ocean Web Design

Copyright © 2017 - WET Engineering - All Rights Reserved
Design By Ocean Web Design

200 OK

OK

The server encountered an internal error or misconfiguration and was unable to complete your request.

Please contact the server administrator, [no address given] and inform them of the time the error occurred, and anything you might have done that may have caused the error.

More information about this error may be available in the server error log.