Town of Cross City, FL

The Oldcastle Lawn and Garden facility, located just outside the Town of Cross City, owned and operated and small on-site potable water plant. Because the finished water contained elevated levels of arsenic, posing an acute public health risk, Oldcastle was encouraged to connect to the Town of Cross City’s distribution system.

In the June 2010, the Department of Community Affairs provided funding through the Community Development Block Grant (CDBG) program to extend a 6” water main approximately 4,500 feet to serve the Oldcastle Lawn and Garden facility. The project included approximately 4,200 feet of DR 18 PVC water main and 350 feet of 8” HDPE DR 11 directional drills to accommodate driveways and road crossings.

The water main was been routed to avoid existing utilities and structures, to include multiple fiber optic cables, overhead power poles, and stormwater culverts in the 40 foot agricultural ditch. The main is located in the county right-of-way of a heavily traveled road between Cross City and Horseshoe Beach.

WET Engineering provided the design and permitting services for the water main extension. Contract documents, specifications and construction plans were created in order to publicly bid the project and WET Engineering provided construction administration services. The project design and construction was fast-tracked in order to meet compliance deadlines established by the Florida Department of Environmental Protection. The Construction on the main was complete in January 2011, almost six months after securing funding.

WET Engineering
4337 Pablo Oaks Court, Suite 101
Jacksonville, Florida 32224
Phone: (904) 223-9773
Copyright © 2018 - All Rights Reserved
Design By Ocean Web Design

Copyright © 2018 - WET Engineering - All Rights Reserved
Design By Ocean Web Design